logo
ProjectActive

Izsu Wastewater

Sector: Water Supply and Storage • Location: Turkiye

Source: IFC Project Disclosures

The proposed IFC investment is a EUR 28 million A loan to IZSU, the Water and Sewerage Administration of the Izmir Metropolitan Municipality (“IMM” or the “Municipality”), to help finance its wastewater treatment investment program in the service area of the Metropolitan Municipality of Izmir. IZSU has an investment plan of nearly EUR 200 million for 2013-2014 including maj

Status
Prospective
Sector
Water Supply and Storage
Location
Turkey
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about Izsu Wastewater

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Izsu Wastewater” is an infrastructure initiative in the Water Supply and Storage sector, located in Turkiye. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The proposed IFC investment is a EUR 28 million A loan to IZSU, the Water and Sewerage Administration of the Izmir Metropolitan Municipality (“IMM” or the “Municipality”), to help finance its wastewater treatment investment program in the service area of the Metropolitan Municipality of Izmir. IZSU has an investment plan of nearly EUR 200 million for 2013-2014 including major wastewater and sludge treatment as well as water and sewerage network infrastructure projects. The IFC loan will specifically finance the expansion of the Cigli Wastewater Treatment Plant (“WWTP”), for which IZSU obtained approval from the Ministry of Development and the Turkish Treasury for foreign borrowing. The Cigli WWTP was built in 2000-01 to treat wastewater from some of the most densely populated districts of the Izmir Metropolitan Municipality, accounting for 82% of Izmir’s total population. Due to rapid population growth and possible infiltration from ground and sea water, the facility currently operates near maximum capacity (605,000 cubic meters per day) and experiences overflows especially during rainy periods. Moreover, important maintenance is needed to replace some facility equipments which have exceeded their useful lives. Hence the need to construct a fourth WWTP phase, which would expand treatment capacity to 821,000 cubic meters per day, avoiding overflows and allowing to shut down earlier modules for maintenance. At the same time, IZSU intends to undertake a study to analyze possible sources of infiltration into its sewerage network.

Original sector

C-BA - Water and Wastewater Utilities

Location

Country

Turkey

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Water Supply and Storage

Article published date

2026-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project