Jackalope Wind Energy Project - 600 MW
Sector: Wind • Location: Bitter Creek, Wyoming, United States of America
Source: Dodge
Proposed new wind facility in southwestern Wyoming, with 213 wind turbines across 293,100 acres in Sweetwater County, about half (166,100 acres) on BLM land. Energy to power approximately 250,000 homes. Point of interconnection is the Job Bridger Substation, located adjacent to the Jim Bridger Power Plant. To be constructed in two phases, each 300 MW.
- Status
- Prospective
- Sector
- Wind, Power Transmission, Residential, Commercial, Power Generation (CCGT)
- Location
- Bitter Creek, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Jackalope Wind Energy Project - 600 MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Proposed new wind facility in southwestern Wyoming, with 213 wind turbines across 293,100 acres in Sweetwater County, about half (166,100 acres) on BLM land. Energy to power approximately 250,000 homes. Point of interconnection is the Job Bridger Substation, located adjacent to the Jim Bridger Power Plant. To be constructed in two phases, each 300 MW. |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Bitter Creek |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Wind, Power Transmission, Residential, Commercial, Power Generation (CCGT) |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- NTIA Tribal Broadband Connectivity Program
- Pump Station 3 Replacement
- Reston Town Center Expansion
- 108th Avenue Northeast transit queue jump
- 4520 Barrett Road Tentative Parcel Map and Abandonment
- Abandonment Of Portions Of An I.O.D. And P.U.E. Located Within 4110 Winding Bluff Lane
- Whisper Wind Temporary Hardship Mobile Home
- 4450 Manzanita Ave (Winding Ranch) Pre Application Meeting
