logo
ProjectUnder Construction

Jackson-29 Flow Test

Under construction · Colorado · Last reported Apr 2025

Source: Investegate

The Jackson-29 well has shown promising results with natural flow during drilling, achieving flow rates of over 320 thousand cubic feet per day, with projected stabilized rates between 350 and 450 Mcfd. Initial gas analysis indicates a helium concentration of up to 3.30%.

Status
Under Construction
Sector
Energy
Location
Colorado, United States of America
Updated
22 Jul 2026
Source
Investegate

ConstructChat

Ask ConstructChat about Jackson-29 Flow Test

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Jackson-29 Flow Test” is an infrastructure initiative in the Energy sector, located in Colorado, USA. Taiyo aggregates data on it from Investegate.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Jackson-29 well has shown promising results with natural flow during drilling, achieving flow rates of over 320 thousand cubic feet per day, with projected stabilized rates between 350 and 450 Mcfd. Initial gas analysis indicates a helium concentration of up to 3.30%.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Colorado

Source

Source

Investegate

URL

More Details

Record type

Project

Article published date

2025-04-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project