Jackson-29 Flow Test
Under construction · Colorado · Last reported Apr 2025
Source: Investegate
The Jackson-29 well has shown promising results with natural flow during drilling, achieving flow rates of over 320 thousand cubic feet per day, with projected stabilized rates between 350 and 450 Mcfd. Initial gas analysis indicates a helium concentration of up to 3.30%.
- Status
- Under Construction
- Sector
- Energy
- Location
- Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Investegate
ConstructChat
Ask ConstructChat about Jackson-29 Flow Test
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Jackson-29 well has shown promising results with natural flow during drilling, achieving flow rates of over 320 thousand cubic feet per day, with projected stabilized rates between 350 and 450 Mcfd. Initial gas analysis indicates a helium concentration of up to 3.30%. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
Source
Source | Investegate |
URL |
More Details
Record type | Project |
Article published date | 2025-04-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
