logo

Jackson-29 Flow Test

Sector: Energy • Location: Colorado, USA

Source: Investegate

Project
Under Construction

The Jackson-29 well has successfully flowed naturally during drilling, with increasing flow rates observed since reaching total depth. The project aims to optimize helium production with projected stabilized flow rates between 350 and 450 Mcfd, and a maximum potential rate of 550 Mcfd.

Project Information FAQ

Project Information

4 Q
The project “Jackson-29 Flow Test” is an infrastructure initiative in the Energy sector, located in Colorado, USA. Taiyo aggregates data on it from Investegate.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Under Construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Jackson-29 well has successfully flowed naturally during drilling, with increasing flow rates observed since reaching total depth. The project aims to optimize helium production with projected stabilized flow rates between 350 and 450 Mcfd, and a maximum potential rate of 550 Mcfd.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data