Jackson-4 Development Well
The owner, status and timeline of this project. A free account opens every field.
Source: ACCESS Newswire
The Jackson-4 well has been spudded at the Galactica helium project in Las Animas County, Colorado. The project aims to drill through the intermediate hole section to target the Lyons Sandstone Formation, with plans for wireline logging and flow testing to estimate production potential.
- Status
- Under Construction
- Sector
- Manufacturing (Industrial)
- Location
- Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- ACCESS Newswire
ConstructChat
Ask ConstructChat about Jackson-4 Development Well
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Jackson-4 well has been spudded at the Galactica helium project in Las Animas County, Colorado. The project aims to drill through the intermediate hole section to target the Lyons Sandstone Formation, with plans for wireline logging and flow testing to estimate production potential. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Colorado |
Source
Source | ACCESS Newswire |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial) |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in USA
- Daniel Webster Western Beltway Resurfacing Improvements
- Central West Central Florida DMS CCTV Camera Installation
- Floridas TurnpikeSR 91 and Claude Pepper Memorial HighwayUS 27 Interchange Improvements Project
- Turnpike Resurfacing and Improvements MP 190 to MP 198
- Turnpike Roadside and Safety Improvements CR 470 to I75
- Turnpike Resurfacing Improvements MP 260 to MP 265
- FY25 standing request for tree care - pruning, removals, stump grinding, chemical injections, etc.
- Widen Sawgrass from North of Oakland Park Blvd to South of Atlantic Blvd
