Jackson Levee Culvert Repair and Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project is to remove and replace unserviceable or damaged culverts within the different levees of the Jackson Project Levees. Culverts to be removed are composed of corrugated metal pipe (CMP). Culverts to be installed in place of the deficient culverts will consist of High-Density Polyethylene (HDPE) pipe or CMP. At two locations, the contractor will be required to install new concrete headw
- Status
- Closed
- Sector
- Metal, Waste Processing and Treatment, Cement, Water Supply and Storage, Chemical (Industrial), Commercial, Manufacturing (Industrial)
- Location
- Jackson, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Jackson Levee Culvert Repair and Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is to remove and replace unserviceable or damaged culverts within the different levees of the Jackson Project Levees. Culverts to be removed are composed of corrugated metal pipe (CMP). Culverts to be installed in place of the deficient culverts will consist of High-Density Polyethylene (HDPE) pipe or CMP. At two locations, the contractor will be required to install new concrete headwalls, either prefabricated or cast-in-place. At other locations, the contractor will use the exis... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Jackson |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Waste Processing and Treatment, Cement, Water Supply and Storage, Chemical (Industrial), Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
