logo

Jackson Railroad Bridges Replacement Project

Sector: Bridge • Location: Jackson, Michigan, United States of America (USA)

Source: Michigan Department of Transportation (MDOT)

Project
Ongoing

MDOT is replacing two 100-year-old railroad bridges over Jackson and Mechanic streets in the city of Jackson. These railroad bridges are on a segment of railroad owned by MDOT within the federally designated high-speed rail corridor between Chicago and Detroit/Pontiac, which supports Amtrak passenger service and Norfolk Southern freight trains. The project includes rebuilding the Blackstone Road g

Project Information FAQ

Project Information

4 Q
The project “Jackson Railroad Bridges Replacement Project” is an infrastructure initiative in the Bridge sector, located in Jackson, Michigan, United States of America (USA). Taiyo aggregates data on it from Michigan Department of Transportation (MDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

MDOT is replacing two 100-year-old railroad bridges over Jackson and Mechanic streets in the city of Jackson. These railroad bridges are on a segment of railroad owned by MDOT within the federally designated high-speed rail corridor between Chicago and Detroit/Pontiac, which supports Amtrak passenger service and Norfolk Southern freight trains. The project includes rebuilding the Blackstone Road grade crossing and approaches, replacing approximately 1,300 feet of railroad corridor retaining walls, rebuilding and lifting approximately 4,000 feet of railroad track, and adding a nonmotorized pathway under the Mechanic Street railroad bridge. The two bridges will be replaced using accelerated bridge construction techniques.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data