Jackson St Road Work
Closed · Illinois · Last reported Jun 2024
Source: Dodge USA
1.Jackson St from Sargent st to Tyler St. 5490 S.Y. Contractor shall replace 945 of curb in various locations. Contractor will remove 12 of pavement from the curb to 8 away from curb (2608 S.Y.) then remove 2 of pavement from the center portion of the road. Contractor then add 8 of rock subbase and prime coat along with 2 of N-50 binder to the shoulder area and then cover all with 2 of N-50 surfac
- Status
- Closed
- Sector
- Commercial, Road, Government
- Location
- Litchfield, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Jackson St Road Work
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1.Jackson St from Sargent st to Tyler St. 5490 S.Y. Contractor shall replace 945 of curb in various locations. Contractor will remove 12 of pavement from the curb to 8 away from curb (2608 S.Y.) then remove 2 of pavement from the center portion of the road. Contractor then add 8 of rock subbase and prime coat along with 2 of N-50 binder to the shoulder area and then cover all with 2 of N-50 surface mix. This includes 7 aprons to adjoining streets. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Litchfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Government |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
