logo

Jackson Street Electric Substation Underground Phase 1

One of 10,000+ projects Taiyo tracks in Texas.

Source: Dodge USA

Project
Closed

This electric distribution project consists of the installation of: I. Approximately 48 of a directional bore with (3) 4 Schedule 40 conduits which will ultimately have primary cable installed in them, at a minimum depth of 60 II. Approximately 834 of open trench with multiple (3) 4 Schedule 40 conduits which will ultimately have primary cable installed in them, at a minimum depth of 60 . Alternat

Status
Closed
Sector
Power Generation (CCGT), Road, Telecommunications, Government, Commercial
Location
Brenham, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Jackson Street Electric Substation Underground Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Jackson Street Electric Substation Underground Phase 1” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brenham, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This electric distribution project consists of the installation of: I. Approximately 48 of a directional bore with (3) 4 Schedule 40 conduits which will ultimately have primary cable installed in them, at a minimum depth of 60 II. Approximately 834 of open trench with multiple (3) 4 Schedule 40 conduits which will ultimately have primary cable installed in them, at a minimum depth of 60 . Alternate Bid - 834 installed by bore from pull pit or box. III. Two (2) traffic load bearing pull boxes ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Brenham

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Road, Telecommunications, Government, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project