Jacob K. Javits Chilled Water Plant Upgrades
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Scope - The Project includes Materials, Labors and Equipment for Upgrade of the existing tenant water-cooled chilled water plant to include installation of two (2) 600 ton chillers, served by two (2) rooftop mounted cooling towers, with new 14 inch chilled water risers. Electrical infrastructure upgrades to include new distribution switchboard and electrical feeds to new equipment. Upgrade of tena
- Status
- Closed
- Sector
- Power Generation (CCGT), Water Supply and Storage, Commercial
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Jacob K. Javits Chilled Water Plant Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes Materials, Labors and Equipment for Upgrade of the existing tenant water-cooled chilled water plant to include installation of two (2) 600 ton chillers, served by two (2) rooftop mounted cooling towers, with new 14 inch chilled water risers. Electrical infrastructure upgrades to include new distribution switchboard and electrical feeds to new equipment. Upgrade of tenant BMS system. Optional scope to include installation of new tenant emergency power generator, up... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Water Supply and Storage, Commercial |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
