Jadranka Hotels
Complete · Croatia
Source: European Bank for Reconstruction and Development (EBRD)
The proposed project consists of an equity investment in Jadranka Hotels d.o.o. The proposed transaction is designed primarily to finance the refurbishment of the group’s existing hotel portfolio through the implementation of a significant capital expenditure programme aimed at improving the standards of existing hotels to international 3 - 4 star ranking. The transition impact of this project ste
- Status
- Closed
- Sector
- Water Supply and Storage, Hotel, Biomass, Residential, Waste Processing and Treatment, Commercial, Government
- Location
- Croatia
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Jadranka Hotels
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of an equity investment in Jadranka Hotels d.o.o. The proposed transaction is designed primarily to finance the refurbishment of the group’s existing hotel portfolio through the implementation of a significant capital expenditure programme aimed at improving the standards of existing hotels to international 3 - 4 star ranking. The transition impact of this project stems from: Jadranka Hotels d.o.o, a limited liability company incorporated in Croatia that owns and operates a portfolio of 10 hotels and villas on the Mali Lošinj island. Jadranka d.d, the sponsor is a holding company, which includes in addition the Jadranka Hotels d.o.o camps operating under Jadranka camps, a charter fleet within Jadranka yachting, and Jadranka trade, a developed retail network. Jadranka d.d is currently listed on the Zagreb Stock Exchange. Up to EUR 24.4 million. EUR 75.3 million. Screening category and justification Screened B/1. Environmental, health and safety issues associated with refurbishment and operation of hotels can be readily identified and addressed through the implementation of adequate mitigation measures. Due diligence and iImplementation requirements Refurbishment and operation of the tourism properties on the Mali Losinj island could be associated with specific environmental issues, such as past environmental liability, ecological conditions of the location, waste water treatment and solid waste management practice of the hotels, life and fire safety issues and adequacy of the mitigation measures. Therefore, a corporate environmental audit of the Sponsor and the existing portfolio are currently under way for the Project in order to examine the Sponsor's environmental risk management practices as well as environmental risks of the sub-projects. The project is required to comply with national and EU environmental, health, safety and labour requirements as well as be in line with overall sustainable tourism requirements of the island. The Bank will monitor the project’s environmental, heath, safety and labour performance during the life of the project. None. Mr. Darin Lekić Jadranka Hotels d.o.o. Jadranka d.d. Dražica 1 51550 Mali Lošinj E-mail: darin.lekic@jadranka.t-com.hr |
Original sector | Real Estate |
Location
Country | Croatia |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hotel, Biomass, Residential, Waste Processing and Treatment, Commercial, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Croatia
- ISLAND&COASTAL INFRASTRUCTURE FACILITY
- ElektranaToplana Zagreb Power Plant Modernisation Zagreb
- Water Wise System
- MUNICIPAL WATER FINANCING FACILITY
- International ship winter shelter on the Danube in Croatia
- Sustainable Integrated Management of International River Corridors in SEE Countries
- Development of touristic navigation on Drava waterway between sections of 0+000 – 198+600 rkm
- A VKI VÉGREHAJTÁSA
