logo

Jagdishpur-Haldia and Bokaro-Dhamra Pipeline Phase Two

Sector: Government • Location: India

Source: Hydrocarbon Technology

Project
Closed

The Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL) project is being developed to connect the eastern Indian states with the national gas grid. Credit: GAIL (India) Limited. Phase-II of the JHBDPL will be 1,836km-long and have a design capacity of 16Mmscmd. Credit: of pmindia. The total investment for the JHBDPL project is estimated to be Rs.129.4bn ($1.8bn). Credit: Indian Oil Corporation Ltd.

Project Information FAQ

Project Information

4 Q
The project “Jagdishpur-Haldia and Bokaro-Dhamra Pipeline Phase Two” is an infrastructure initiative in the Government sector, located in India. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL) project is being developed to connect the eastern Indian states with the national gas grid. Credit: GAIL (India) Limited. Phase-II of the JHBDPL will be 1,836km-long and have a design capacity of 16Mmscmd. Credit: of pmindia. The total investment for the JHBDPL project is estimated to be Rs.129.4bn ($1.8bn). Credit: Indian Oil Corporation Ltd. Jagdishpur-Haldia and Bokaro-Dhamra Pipeline (JHBDPL) phase two is a 1,836km-long gas pipeline system being developed in the states of Odisha, Jharkhand and West Bengal in India. The JHBDPL Phase-II forms part of the larger 2,655km-long JHBDPL pipeline project, which originates from Uttar Pradesh, a state in North India. Being developed by India’s state-owned Gas Authority of India Limited (GAIL), the JHBDPL project is intended to connect the eastern part of the country with the National Gas Grid. Estimated to cost Rs93.8bn ($1.4bn), the JHBDPL Phase-II project will involve two branch lines. One of the lines will run from Dobhi in Bihar to Haldia in West Bengal, while the other will extend from Bokaro in Jharkhand to Dhamra in Odisha. Scheduled for completion by the end of 2020, the pipeline project will ensure widespread supply of natural gas for the domestic, industrial and transport sectors. The JHBDPL project, also popularly known as the Pradhan Mantri Urja Ganga (PMUG) project, was inaugurated in July 2015. The pipeline system will pass through five Indian states including Uttar Pradesh, Bihar, Jharkhand, Odisha and West Bengal. Phase-I of the JHBDPL project encompasses a 753km pipeline segment from Phulpur near Allahabad in UP to Dhobi in Bihar, as well as spur lines to major cities including Varanasi, Gorakhpur and Patna, along with its route. In Phase-II, the pipeline will be extended to West Bengal and Odisha and connect via en-route spur lines to Barauni, Bokaro, Ranchi, Sindri, Rourkela, Sambalpur, Jharsuguda, Angul, Cuttack, Bhubaneshwar, Paradip, Jamshedpur, Durgapur, Kolkata and Haldia. The pipeline is also proposed to be extended to Assam via the 729km-long Barauni-Guwahati pipeline by the end of 2021 during Phase-III development of the JHBDPL project. Angul-Mumbai natural gas pipeline is another proposed extension on the JHBDPL pipeline system. The JHBDPL Phase-II pipeline will have a design capacity to supply 16 million metric standard cubic meters of natural gas a day (Mmscmd), including a common carrier of 4Mmscmd, at a design pressure of 92kg/cm². Diameter of the pipeline will range from 4in to 36in. The 1,836km pipeline will run for 762km in Odisha, 524km in Jharkhand and 550km in West Bengal. In December 2018, the foundation stone for the Bokaro-Angul section of the pipeline was laid. Total length of the section will be 667km, of which 367km will be in Odisha and the remaining 300km in Jharkhand. The pipeline will cover five districts in Odisha and six districts in Jharkhand. The potential gas sources for the JHBDPL pipeline include regasified LNG (RLNG) from the Dahej (Gujarat) and Dabhol (Maharashtra) terminals via the Vijaipur-Auraiya-Phulpur pipeline, gas from Reliance Industries’ coal bed methane blocks near Shahdolin Madhya Pradesh via the 302kmShahdol-Phulpur gaspipeline, and RLNG from the 5Mtpa Dhamra LNG import terminal. GAIL is developing the city gas distribution network for supplying piped natural gas from the JHBDPL system to households in seven cities across 40 districts. The geographical areas for the development of city gas distribution networks have already been selected by the Petroleum and Natural Gas Regulatory Board (PNGRB). Total investment for the JHBDPL project is estimated to be Rs129.4bn ($1.8bn), which includes a 40% capital grant of Rs51.76bn ($740m) from the Government of India. Man Industries was awarded a contract worth Rs9250m ($142.44m) for the supply of approximately 116,000t of pipe joints for the JHBDPL project in October 2017. IL&FS Engineering Services received the contract to construct the Bokaro-Angul section of the JHBDPL Phase-II pipeline project in April 2018. CorrTech was contracted for permanent cathodic protection (CP) system works for 955km of the JHBDPL Phase-II project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data