Jakarta – Bandung High-Speed Railway
Sector: Mass Transit • Location: Jakarta, Indonesia
Source: RailTech
Trials of the Jakarta – Bandung high-speed railway will be conducted in November 2022, coinciding with the G20 summit in Indonesia. The high-speed railway has a track length of 142.3 kilometers from Jakarta to Bandung, with four stopping stations: Halim, Karawang, Padalarang, and Tegalluar. The travel time between the two central hubs will be reduced to 36 minutes from the original 3 to 5 hours by
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Trials of the Jakarta – Bandung high-speed railway will be conducted in November 2022, coinciding with the G20 summit in Indonesia. The high-speed railway has a track length of 142.3 kilometers from Jakarta to Bandung, with four stopping stations: Halim, Karawang, Padalarang, and Tegalluar. The travel time between the two central hubs will be reduced to 36 minutes from the original 3 to 5 hours by train. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
