Jakarta Outer Ring Road (E2, E3 and N sections)
Sector: Road • Location: Indonesia
Source: World Bank Group
In 1995, PT Citra Bhakti Marga Persada signed a 33-year BOT contract for the construction and operation of sections E2, E3 and N of the Jakarta Outer Ring Road. The 9km E2 section was already built and had been operated by PT Jasa Marga since 1990. The remaining 19.12km was under construction (all land has been acquired) and was due to open in December 1999. Project costs were estimated at Rp1,044
- Status
- Failure
- Sector
- Road, Commercial, Steel, Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Jakarta Outer Ring Road (E2, E3 and N sections)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Cancelled |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In 1995, PT Citra Bhakti Marga Persada signed a 33-year BOT contract for the construction and operation of sections E2, E3 and N of the Jakarta Outer Ring Road. The 9km E2 section was already built and had been operated by PT Jasa Marga since 1990. The remaining 19.12km was under construction (all land has been acquired) and was due to open in December 1999. Project costs were estimated at Rp1,044.3 billion (US$224 million). The Asian Crisis created a rapid currency devaluation and economic decline. As a result, the cost of imported construction materials rose sharply and credit became difficult for concessionaires to obtain, even at very high interest rates. On the demand side, toll road traffic in general began to decline be as much as 8.1% in 1998. Social pressures caused the Government to be reluctant to adjust toll rates. Coupled with construction cost overruns, these factors made it increasingly difficult for the concessionaires to repay US Dollar denominated debts to the local banks. When they defaulted on payments to local banks, Jasa Marga revoked the concession rights to the JORR operators. As of May 2002, the government was still working on the re-tendering process. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Steel, Government |
Article published date | 2024-09-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project