Jakarta Outer Ring Road (E2, E3 and N sections)

Sector: Road • Location: Indonesia

Source: World Bank Group

Project
Cancelled

In 1995, PT Citra Bhakti Marga Persada signed a 33-year BOT contract for the construction and operation of sections E2, E3 and N of the Jakarta Outer Ring Road. The 9km E2 section was already built and had been operated by PT Jasa Marga since 1990. The remaining 19.12km was under construction (all land has been acquired) and was due to open in December 1999. Project costs were estimated at Rp1,044

Status
Failure
Sector
Road, Commercial, Steel, Government
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Jakarta Outer Ring Road (E2, E3 and N sections)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Jakarta Outer Ring Road (E2, E3 and N sections)” is an infrastructure initiative in the Road sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Cancelled

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In 1995, PT Citra Bhakti Marga Persada signed a 33-year BOT contract for the construction and operation of sections E2, E3 and N of the Jakarta Outer Ring Road. The 9km E2 section was already built and had been operated by PT Jasa Marga since 1990. The remaining 19.12km was under construction (all land has been acquired) and was due to open in December 1999. Project costs were estimated at Rp1,044.3 billion (US$224 million). The Asian Crisis created a rapid currency devaluation and economic decline. As a result, the cost of imported construction materials rose sharply and credit became difficult for concessionaires to obtain, even at very high interest rates. On the demand side, toll road traffic in general began to decline be as much as 8.1% in 1998. Social pressures caused the Government to be reluctant to adjust toll rates. Coupled with construction cost overruns, these factors made it increasingly difficult for the concessionaires to repay US Dollar denominated debts to the local banks. When they defaulted on payments to local banks, Jasa Marga revoked the concession rights to the JORR operators. As of May 2002, the government was still working on the re-tendering process.

Original sector

Transport

Procurement method

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Commercial, Steel, Government

Article published date

2024-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project