Jakarta Outer Ring Road (S and E1 sections)
Sector: Road • Location: Indonesia
Source: World Bank Group
In 1993, the Indonesian consortium PT Marga Nurindo Bhakti entered into a joint venture with state-owned toll road company Jasa Marga by signing a 29-year BOT contract for the 15 km S section of the Jakarta Outer Ring Road (JORR). In 1995, the consortium also signed an additional 45-year BOT agreement for the 13 km E1 section.
The Asian Crisis created a rapid currency devaluation and economic
- Status
- Failure
- Sector
- Road, Government, Commercial, Steel, Manufacturing (Industrial)
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Jakarta Outer Ring Road (S and E1 sections)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Cancelled |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In 1993, the Indonesian consortium PT Marga Nurindo Bhakti entered into a joint venture with state-owned toll road company Jasa Marga by signing a 29-year BOT contract for the 15 km S section of the Jakarta Outer Ring Road (JORR). In 1995, the consortium also signed an additional 45-year BOT agreement for the 13 km E1 section. The Asian Crisis created a rapid currency devaluation and economic decline. As a result, the cost of imported construction materials rose sharply and credit became difficult for concessionaires to obtain, even at very high interest rates. On the demand side, toll road traffic in general began to decline be as much as 8.1% in 1998. Social pressures caused the Government to be reluctant to adjust toll rates. Coupled with construction cost overruns, these factors made it increasingly difficult for the concessionaires to repay US Dollar denominated debts to the local banks. When they defaulted on payments to local banks, Jasa Marga revoked the concession rights to the JORR operators. As of May 2002, the government was still working on the re-tendering process. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Steel, Manufacturing (Industrial) |
Article published date | 2024-09-19 |
Research
Free account
View all details