Jakarta Outer Ring Road (S and E1 sections)
Sector: Steel • Location: Indonesia
Source: World Bank Group
In 1993, the Indonesian consortium PT Marga Nurindo Bhakti entered into a joint venture with state-owned toll road company Jasa Marga by signing a 29-year BOT contract for the 15 km S section of the Jakarta Outer Ring Road (JORR). In 1995, the consortium also signed an additional 45-year BOT agreement for the 13 km E1 section.
The Asian Crisis created a rapid currency devaluation and economic
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Cancelled |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In 1993, the Indonesian consortium PT Marga Nurindo Bhakti entered into a joint venture with state-owned toll road company Jasa Marga by signing a 29-year BOT contract for the 15 km S section of the Jakarta Outer Ring Road (JORR). In 1995, the consortium also signed an additional 45-year BOT agreement for the 13 km E1 section. The Asian Crisis created a rapid currency devaluation and economic decline. As a result, the cost of imported construction materials rose sharply and credit became difficult for concessionaires to obtain, even at very high interest rates. On the demand side, toll road traffic in general began to decline be as much as 8.1% in 1998. Social pressures caused the Government to be reluctant to adjust toll rates. Coupled with construction cost overruns, these factors made it increasingly difficult for the concessionaires to repay US Dollar denominated debts to the local banks. When they defaulted on payments to local banks, Jasa Marga revoked the concession rights to the JORR operators. As of May 2002, the government was still working on the re-tendering process. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Steel projects in Indonesia
- Rajamandala Hydropower Project
- Merck Sharpe & Dohme Formulation Plant
- Tangguh LNG Project, Bintuni Bay, West Papua
- Cilegon Gas Turbine CombinedCycle GTCC
- Donggi-Senoro LNG Project
- Pfizer’s Bulk Pharmaceuticals Facility, Tuas, Singapore
- Jakarta Outer Ring Road (S and E1 sections)
- Bontang LNG Plant (Liquid Natural Gas Project), Indonesia