Jakarta Outer Ring Road (S and E1 sections)

Sector: Road • Location: Indonesia

Source: World Bank Group

Project
Cancelled

In 1993, the Indonesian consortium PT Marga Nurindo Bhakti entered into a joint venture with state-owned toll road company Jasa Marga by signing a 29-year BOT contract for the 15 km S section of the Jakarta Outer Ring Road (JORR). In 1995, the consortium also signed an additional 45-year BOT agreement for the 13 km E1 section.

The Asian Crisis created a rapid currency devaluation and economic

Project Information FAQ

Project Information

4 Q
The project “Jakarta Outer Ring Road (S and E1 sections)” is an infrastructure initiative in the Road sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 1993, the Indonesian consortium PT Marga Nurindo Bhakti entered into a joint venture with state-owned toll road company Jasa Marga by signing a 29-year BOT contract for the 15 km S section of the Jakarta Outer Ring Road (JORR). In 1995, the consortium also signed an additional 45-year BOT agreement for the 13 km E1 section. The Asian Crisis created a rapid currency devaluation and economic decline. As a result, the cost of imported construction materials rose sharply and credit became difficult for concessionaires to obtain, even at very high interest rates. On the demand side, toll road traffic in general began to decline be as much as 8.1% in 1998. Social pressures caused the Government to be reluctant to adjust toll rates. Coupled with construction cost overruns, these factors made it increasingly difficult for the concessionaires to repay US Dollar denominated debts to the local banks. When they defaulted on payments to local banks, Jasa Marga revoked the concession rights to the JORR operators. As of May 2002, the government was still working on the re-tendering process.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data