logo

Jakarta Outer Ring Road (S and E1 sections)

Sector: Road • Location: Indonesia

Source: World Bank Group

Project
Cancelled

In 1993, the Indonesian consortium PT Marga Nurindo Bhakti entered into a joint venture with state-owned toll road company Jasa Marga by signing a 29-year BOT contract for the 15 km S section of the Jakarta Outer Ring Road (JORR). In 1995, the consortium also signed an additional 45-year BOT agreement for the 13 km E1 section.

The Asian Crisis created a rapid currency devaluation and economic

Status
Failure
Sector
Road, Commercial, Steel, Government, Manufacturing (Industrial)
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Jakarta Outer Ring Road (S and E1 sections)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Jakarta Outer Ring Road (S and E1 sections)” is an infrastructure initiative in the Road sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Cancelled

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In 1993, the Indonesian consortium PT Marga Nurindo Bhakti entered into a joint venture with state-owned toll road company Jasa Marga by signing a 29-year BOT contract for the 15 km S section of the Jakarta Outer Ring Road (JORR). In 1995, the consortium also signed an additional 45-year BOT agreement for the 13 km E1 section. The Asian Crisis created a rapid currency devaluation and economic decline. As a result, the cost of imported construction materials rose sharply and credit became difficult for concessionaires to obtain, even at very high interest rates. On the demand side, toll road traffic in general began to decline be as much as 8.1% in 1998. Social pressures caused the Government to be reluctant to adjust toll rates. Coupled with construction cost overruns, these factors made it increasingly difficult for the concessionaires to repay US Dollar denominated debts to the local banks. When they defaulted on payments to local banks, Jasa Marga revoked the concession rights to the JORR operators. As of May 2002, the government was still working on the re-tendering process.

Original sector

Transport

Procurement method

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Commercial, Steel, Government, Manufacturing (Industrial)

Article published date

2024-09-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project