Jalore Ramsingh Revdar State Highway

Sector: Bridge • Location: Rajasthan, India

Source: World Bank Group

Project
Active

On 9th December 2011, the Government of Rajasthan awarded a concession of 12-years 7-months and 27-days (including 1-year construction period) to D.K.Infrastructure Private Limited for the strengthening, improvement, 2-laning, operation and maintenance, and tolling of 77.80kms of Jalore–Ramsingh–Revdar section of road comprising SH-64 (0/000 to 76/500), in the state of Rajasthan.

Under the contr

Status
Prospective
Sector
Bridge, Government, Road, Commercial, Waste Processing and Treatment
Location
Rajasthan, India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Jalore Ramsingh Revdar State Highway

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Jalore Ramsingh Revdar State Highway” is an infrastructure initiative in the Bridge sector, located in Rajasthan, India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On 9th December 2011, the Government of Rajasthan awarded a concession of 12-years 7-months and 27-days (including 1-year construction period) to D.K.Infrastructure Private Limited for the strengthening, improvement, 2-laning, operation and maintenance, and tolling of 77.80kms of Jalore–Ramsingh–Revdar section of road comprising SH-64 (0/000 to 76/500), in the state of Rajasthan. Under the contract, D.K.Infrastructure was responsible for the design, construction, finance, operation and maintenance, strengthening and widening the existing carriageway of Jalore–Ramsingh–Revdar section to 2-lane standard with paved shoulders.The scope included construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts,road intersections,interchanges, drains, traffic signages, traffic safety measures, etc. The Government of India, Ministry of Road Transport and Highways (MORTH) through Public Works Department (PWD), Government of Rajasthan had decided to take up the development of various National Highway Corridors for augmentation of capacity for safe and efficient movement of traffic by widening to 2-lane with paved shoulder. This road project covering Jalore and Sirohi districts was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. D.K.Infrastructure Private Limited won the tender through international competitive bidding, conducted by PWD Rajasthan, by quoting the lowest concession period of 12-years 7-months and 27-days. Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession. D.K.Infrastructure would execute the EPC for this project. The concession agreement for the project was signed on 10th May 2012. Details of financing were not available at the time of collection of this information. The estimated capital cost of the project at the time of financial closure was US$ 10.35mn (INR 517.5 mn @ 50 INR/USD). The construction of project started in May 2012 (Appointed Date) and was expected to be operational by April 2013.

Original sector

Transport

Procurement method

Budget

Location

Country

India

State

Rajasthan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Bridge, Government, Road, Commercial, Waste Processing and Treatment

Article published date

2024-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project