James Island Ecosystem Restoration (Phase 2 )
Sector: Manufacturing (Industrial) • Location: Maryland, United States of America
Source: Dodge
Restore James Island (2,072 acres) with a habitat proportion of 45% upland to 55% wetland and an upland dike height of 20 feet above MLLW. Restoration of the island will occur by the beneficial use of approximately 90 to 95 MCY of dredged material for more than 30 years. Intent of Phase 2 is to complete the construction of the upland dikes, construct the perimeter of wetland cell dikes, install th
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial
- Location
- Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about James Island Ecosystem Restoration (Phase 2 )
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Restore James Island (2,072 acres) with a habitat proportion of 45% upland to 55% wetland and an upland dike height of 20 feet above MLLW. Restoration of the island will occur by the beneficial use of approximately 90 to 95 MCY of dredged material for more than 30 years. Intent of Phase 2 is to complete the construction of the upland dikes, construct the perimeter of wetland cell dikes, install the wetland spillways, and complete stockpiling of substantial sand resources. |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
