logo
ProjectClosed

Jamuna Bridge

Closed · Bangladesh

Source: World Bank Group

The Jamuna Bridge Project aims to achieve the strategic objective of connecting the east and west parts of the country separated by the Jamuna River, thus stimulating the economic growth by facilitating inter-regional, cross-river transport of passengers, freight and transmission of electricity more economically and efficiently. The project will also facilitate the transmission of natural gas and

Status
Closed
Sector
Mass Transit, Road, Rail, Bridge, Natural Gas, Power Generation (CCGT), Government
Location
Bangladesh
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Jamuna Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Jamuna Bridge” is an infrastructure initiative in the Mass Transit sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Jamuna Bridge Project aims to achieve the strategic objective of connecting the east and west parts of the country separated by the Jamuna River, thus stimulating the economic growth by facilitating inter-regional, cross-river transport of passengers, freight and transmission of electricity more economically and efficiently. The project will also facilitate the transmission of natural gas and telecommunications between the east and west in a cost-effective manner, as well as a meter gauge railway connection. The project consists of: (a) construction of a bridge about 4.8 km long, with a design life of 100 years; (b) construction of two end viaducts to connect the bridge to the approach roads; (c) construction of two guide bunds, of about 2.2 km each and a flood protection bund on the east bank to regulate the river at the chosen site; (d) construction of east and west approach roads; (e) measures to mitigate the project's effects on the environment, including resettlement, compensation of project affected persons, fisheries and wild life, and environmental monitoring; and (f) technical assistance and training.

Original sector

FY17 - Public Administration,Transportation

Budget

Location

Country

Bangladesh

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Road, Rail, Bridge, Natural Gas, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project