logo

Jamuna Bridge

Sector: Mass Transit • Location: Bangladesh

Source: World Bank Group

Project
Closed

The Jamuna Bridge Project aims to achieve the strategic objective of connecting the east and west parts of the country separated by the Jamuna River, thus stimulating the economic growth by facilitating inter-regional, cross-river transport of passengers, freight and transmission of electricity more economically and efficiently. The project will also facilitate the transmission of natural gas and

Project Information FAQ

Project Information

5 Q
The project “Jamuna Bridge” is an infrastructure initiative in the Mass Transit sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Jamuna Bridge Project aims to achieve the strategic objective of connecting the east and west parts of the country separated by the Jamuna River, thus stimulating the economic growth by facilitating inter-regional, cross-river transport of passengers, freight and transmission of electricity more economically and efficiently. The project will also facilitate the transmission of natural gas and telecommunications between the east and west in a cost-effective manner, as well as a meter gauge railway connection. The project consists of: (a) construction of a bridge about 4.8 km long, with a design life of 100 years; (b) construction of two end viaducts to connect the bridge to the approach roads; (c) construction of two guide bunds, of about 2.2 km each and a flood protection bund on the east bank to regulate the river at the chosen site; (d) construction of east and west approach roads; (e) measures to mitigate the project's effects on the environment, including resettlement, compensation of project affected persons, fisheries and wild life, and environmental monitoring; and (f) technical assistance and training.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data