Janssen Road Structure Spillway Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The project involves removing 164 LF of aged CMP principal spillway and drawdown pipe and replacing them with HDPE pipe in an earthen dam. Waverly Road runs on top of the dam embankment. This will require removal and replacement of a section of the road, along with traffic control and other necessary incidental items. The project is located in Seward County, Nebraska.
- Status
- Closed
- Sector
- Water Supply and Storage, Hydro, Road, Commercial, Government
- Location
- Seward, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Janssen Road Structure Spillway Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves removing 164 LF of aged CMP principal spillway and drawdown pipe and replacing them with HDPE pipe in an earthen dam. Waverly Road runs on top of the dam embankment. This will require removal and replacement of a section of the road, along with traffic control and other necessary incidental items. The project is located in Seward County, Nebraska. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Seward |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Road, Commercial, Government |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
