logo
ProjectUnder Construction

Japan's 4.5MW Bitcoin Mining Project

Under construction · Japan · Last reported Nov 2025

Source: The Currency analytics

A 4.5-megawatt Bitcoin mining project in Japan using hydro-cooled Canaan Avalon rigs, integrated with the national power grid to stabilize renewable energy systems by absorbing excess renewable power during low demand and scaling down during high demand.

Status
Under Construction
Sector
Power Generation (CCGT), Government, Power Transmission, Hydro
Location
Japan
Updated
22 Jul 2026
Source
The Currency analytics

ConstructChat

Ask ConstructChat about Japan's 4.5MW Bitcoin Mining Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Japan's 4.5MW Bitcoin Mining Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Japan. Taiyo aggregates data on it from The Currency analytics.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 4.5-megawatt Bitcoin mining project in Japan using hydro-cooled Canaan Avalon rigs, integrated with the national power grid to stabilize renewable energy systems by absorbing excess renewable power during low demand and scaling down during high demand.

Original sector

Energy

Location

Country

Japan

Source

Source

The Currency analytics

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Power Transmission, Hydro

Article published date

2025-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project