logo
ProjectBid Results

Jasper - Mill Creek Apartments Phase 1

Sector: Commercial • Location: Moab, Utah, United States of America

Source: Dodge USA

This invitation is for Phase 1 and will include 88 units (two - 3 story 24-plex buildings 24,611 sq ft each , one 3 story 12-plex building 15,735sq ft and a 3750 sq ft clubhouse building with a 4-plex above). It s anticipated that grading and retaining wall work will start spring of 2025. Per the geotech report once subgraded, the site has to settle for 90-days before remaining construction can co

Status
Closed
Sector
Commercial, Cement, Manufacturing (Industrial), Power Transmission, Residential, Power Generation (CCGT)
Location
Moab, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Jasper - Mill Creek Apartments Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Jasper - Mill Creek Apartments Phase 1” is an infrastructure initiative in the Commercial sector, located in Moab, Utah, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This invitation is for Phase 1 and will include 88 units (two - 3 story 24-plex buildings 24,611 sq ft each , one 3 story 12-plex building 15,735sq ft and a 3750 sq ft clubhouse building with a 4-plex above). It s anticipated that grading and retaining wall work will start spring of 2025. Per the geotech report once subgraded, the site has to settle for 90-days before remaining construction can continue. Work bidding includes: SWPP, surveying, earthwork/utilities, concrete retaining walls, MS...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Moab

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Cement, Manufacturing (Industrial), Power Transmission, Residential, Power Generation (CCGT)

Article published date

2024-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project