logo
ProjectCompleted

Jasper County Solar Project

One of 10,000+ projects Taiyo tracks in Indiana.

Source: Reuters

The 81 MW Jasper County Solar project in Indiana was completed in December 2025 as part of Meta's target of sourcing 100% clean energy. It is one of seven solar PPAs signed by Zelestra with Meta totaling 1.2 GW, with the other six projects due for completion between 2026 and 2028.

Status
Closed
Sector
Solar, Power Generation (CCGT)
Location
Indiana, United States of America
Updated
22 Jul 2026
Source
Reuters

ConstructChat

Ask ConstructChat about Jasper County Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Jasper County Solar Project” is an infrastructure initiative in the Solar sector, located in Indiana, United States. Taiyo aggregates data on it from Reuters.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 81 MW Jasper County Solar project in Indiana was completed in December 2025 as part of Meta's target of sourcing 100% clean energy. It is one of seven solar PPAs signed by Zelestra with Meta totaling 1.2 GW, with the other six projects due for completion between 2026 and 2028.

Original sector

Energy

Location

Country

United States of America (USA)

State

Indiana

Source

Source

Reuters

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2026-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project