logo
ProjectClosed

Jasper Substation Breaker Infrastructure

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

EPCOR is seeking a qualified contractor to install supporting infrastructure for upcoming projects at Jasper Substation including cable trench, cable ducts. RFP-2025-EDTI-20-AB-Edmonton (Transmission)-Jasper Substation Breaker Infrastructure

Status
Closed
Sector
Power Generation (CCGT), Road, Telecommunications, Commercial
Location
Edmonton, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Jasper Substation Breaker Infrastructure

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Jasper Substation Breaker Infrastructure” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Edmonton, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

EPCOR is seeking a qualified contractor to install supporting infrastructure for upcoming projects at Jasper Substation including cable trench, cable ducts. RFP-2025-EDTI-20-AB-Edmonton (Transmission)-Jasper Substation Breaker Infrastructure

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Edmonton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Road, Telecommunications, Commercial

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project