Jasper Treatment Plant Rehabilitation
Sector: Power Generation (CCGT) • Location: Wichita Falls, Texas, United States of America
Source: Dodge USA
A new pump station is required to use the full range of the ground storage at Jasper Water Treatment Plant. Updating pumps will require a new pump station due to current electrical codes and space requirements inside the current high service pump station. This would also allow operators to pump the full capacity of the plant. The City of Wichita Falls of may be seeking a consultant to provide Desi
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Commercial
- Location
- Wichita Falls, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Jasper Treatment Plant Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A new pump station is required to use the full range of the ground storage at Jasper Water Treatment Plant. Updating pumps will require a new pump station due to current electrical codes and space requirements inside the current high service pump station. This would also allow operators to pump the full capacity of the plant. The City of Wichita Falls of may be seeking a consultant to provide Design services for the Jasper Treatment Plant Rehabilitation project. |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Wichita Falls |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
