logo

Jatiluhur I Drinking Water Supply System

Sector: Water Supply and Storage • Location: Indonesia

Source: World Bank Group

Project
Active

Jatiluhur I Drinking Water Supply System (SPAM) project includes the construction of water intakes, transmission pipes and water treatment plants in capital city of Jakarta, Indonesia. The project has a design capacity of 4,750 litres per second and supplies water to Karawang Regency, Bekasi Regency, Bekasi City and Jakarta. Shareholders of the project company Wika Tirta Jaya Jatiluhur are state-o

Project Information FAQ

Project Information

5 Q
The project “Jatiluhur I Drinking Water Supply System” is an infrastructure initiative in the Water Supply and Storage sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Jatiluhur I Drinking Water Supply System (SPAM) project includes the construction of water intakes, transmission pipes and water treatment plants in capital city of Jakarta, Indonesia. The project has a design capacity of 4,750 litres per second and supplies water to Karawang Regency, Bekasi Regency, Bekasi City and Jakarta. Shareholders of the project company Wika Tirta Jaya Jatiluhur are state-owned company Wijaya Karya (80%), together with a member of the Jaya Group - Jaya Konstruksi Manggala Pratama (17.4%) and Tirta Gemah Ripah (2.56%). The consortium emerged as the winning bidder, outbidding 3 other bidders prequalified in March 2018. Offtakers included state-owned regional water distributors PAM Jaya, PDAM tirta Patriot Bekasi, PDAM Tirta Bhagasasi Bekasi, and PDAM Tirta Tarum Karawang.The 30-year concession includes a 2.5-year construction period and the scheduled commercial operation date is 2024. The total project cost is Rp1.675 trillion ($116.74 million), which will be financed with a mix of debt (70%) and equity (30%). The 11-year debt was provided by Bank Mandiri, Sarana Multi Infrastruktur and Bank Pembangunan Daerah Jawa Barat dan Banten. Indonesia Infrastructure Guarantee Fund, under the Ministry of Finance, provided government guarantee for the project for 15 years to guarantee the risk of default and termination. Financial close was achieved on 5 April, 2022. Realfin IJGlobal: Wijaya Karya reaches FC on Indonesia water PPP https://ptpii.co.id/iigf-gives-government-guarantee-to-the-jatiluhur-1-water-supply-system-ppp-project#:~:text=The%20Jatiluhur%201%20Regional%20Water,supply%20needs%20in%20the%20DKI https://setkab.go.id/en/govt-to-develop-jatiluhur-drinking-water-system-to-improve-peoples-quality-of-life/

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data