Jatiluhur I Drinking Water Supply System
Sector: Commercial • Location: Indonesia
Source: World Bank Group
Jatiluhur I Drinking Water Supply System (SPAM) project includes the construction of water intakes, transmission pipes and water treatment plants in capital city of Jakarta, Indonesia. The project has a design capacity of 4,750 litres per second and supplies water to Karawang Regency, Bekasi Regency, Bekasi City and Jakarta. Shareholders of the project company Wika Tirta Jaya Jatiluhur are state-o
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Jatiluhur I Drinking Water Supply System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Jatiluhur I Drinking Water Supply System (SPAM) project includes the construction of water intakes, transmission pipes and water treatment plants in capital city of Jakarta, Indonesia. The project has a design capacity of 4,750 litres per second and supplies water to Karawang Regency, Bekasi Regency, Bekasi City and Jakarta. Shareholders of the project company Wika Tirta Jaya Jatiluhur are state-owned company Wijaya Karya (80%), together with a member of the Jaya Group - Jaya Konstruksi Manggala Pratama (17.4%) and Tirta Gemah Ripah (2.56%). The consortium emerged as the winning bidder, outbidding 3 other bidders prequalified in March 2018. Offtakers included state-owned regional water distributors PAM Jaya, PDAM tirta Patriot Bekasi, PDAM Tirta Bhagasasi Bekasi, and PDAM Tirta Tarum Karawang.The 30-year concession includes a 2.5-year construction period and the scheduled commercial operation date is 2024. The total project cost is Rp1.675 trillion ($116.74 million), which will be financed with a mix of debt (70%) and equity (30%). The 11-year debt was provided by Bank Mandiri, Sarana Multi Infrastruktur and Bank Pembangunan Daerah Jawa Barat dan Banten. Indonesia Infrastructure Guarantee Fund, under the Ministry of Finance, provided government guarantee for the project for 15 years to guarantee the risk of default and termination. Financial close was achieved on 5 April, 2022. Realfin IJGlobal: Wijaya Karya reaches FC on Indonesia water PPP https://ptpii.co.id/iigf-gives-government-guarantee-to-the-jatiluhur-1-water-supply-system-ppp-project#:~:text=The%20Jatiluhur%201%20Regional%20Water,supply%20needs%20in%20the%20DKI https://setkab.go.id/en/govt-to-develop-jatiluhur-drinking-water-system-to-improve-peoples-quality-of-life/ |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-05-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
