logo
ProjectClosed

Java-Bali Power Sector Restructuring and Strengthening Project

Closed · Indonesia

Source: World Bank Group

The Java-Bali Power Sector Restructuring and Strengthening Project for Indonesia aims to improve the performance of the power sector on Java-Bali by: (a) supporting the State power company (PLN) to implement its financial and corporate restructuring plan, and to strengthen key elements of the Java-Bali electricity supply system; and (b) assisting the State gas company (PGN) to prepare the groundwo

Status
Closed
Sector
Power Generation (CCGT), Oil and Gas, Natural Gas, Geothermal, Government
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Java-Bali Power Sector Restructuring and Strengthening Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Java-Bali Power Sector Restructuring and Strengthening Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Java-Bali Power Sector Restructuring and Strengthening Project for Indonesia aims to improve the performance of the power sector on Java-Bali by: (a) supporting the State power company (PLN) to implement its financial and corporate restructuring plan, and to strengthen key elements of the Java-Bali electricity supply system; and (b) assisting the State gas company (PGN) to prepare the groundwork for restructuring its gas transmission and distribution operations. There are five components to the project. 1) The Project will support PLN's initiatives to (a) achieve greater utilization of existing generation capacity on Java-Bali, (b) improve the security of supply to the cities of Cirebon and Surabaya, and (c) debottleneck local interconnections between bulk transmission and subtransmission. 2) The Project will support PLN's initiatives to (a) provide a level of security commensurate with the existing and potential PLN and PP geothermal generation capacity evacuated through the West Java 150kV subtransmission network near Bandung, (b) improve security of supply to Surabaya, and (c) relieve multiple localized overloading and voltage problems at subtransmission level. 3) The Project will support PLN to implement a pilot rollout of the company's Enterprise Resource Planning (ERP) information system. 4) The Project will also support PLN's restructuring program-as well as its institutional strengthening initiatives-through technical assistance. 5) The Project will support PGN's restructuring and institutional strengthening initiatives, through technical assistance.

Original sector

FY17 - Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Oil and Gas, Natural Gas, Geothermal, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project