Java-Bali Power Sector Restructuring and Strengthening Project
Closed · Indonesia
Source: World Bank Group
The Java-Bali Power Sector Restructuring and Strengthening Project for Indonesia aims to improve the performance of the power sector on Java-Bali by: (a) supporting the State power company (PLN) to implement its financial and corporate restructuring plan, and to strengthen key elements of the Java-Bali electricity supply system; and (b) assisting the State gas company (PGN) to prepare the groundwo
- Status
- Closed
- Sector
- Power Generation (CCGT), Oil and Gas, Natural Gas, Geothermal, Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Java-Bali Power Sector Restructuring and Strengthening Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Java-Bali Power Sector Restructuring and Strengthening Project for Indonesia aims to improve the performance of the power sector on Java-Bali by: (a) supporting the State power company (PLN) to implement its financial and corporate restructuring plan, and to strengthen key elements of the Java-Bali electricity supply system; and (b) assisting the State gas company (PGN) to prepare the groundwork for restructuring its gas transmission and distribution operations. There are five components to the project. 1) The Project will support PLN's initiatives to (a) achieve greater utilization of existing generation capacity on Java-Bali, (b) improve the security of supply to the cities of Cirebon and Surabaya, and (c) debottleneck local interconnections between bulk transmission and subtransmission. 2) The Project will support PLN's initiatives to (a) provide a level of security commensurate with the existing and potential PLN and PP geothermal generation capacity evacuated through the West Java 150kV subtransmission network near Bandung, (b) improve security of supply to Surabaya, and (c) relieve multiple localized overloading and voltage problems at subtransmission level. 3) The Project will support PLN to implement a pilot rollout of the company's Enterprise Resource Planning (ERP) information system. 4) The Project will also support PLN's restructuring program-as well as its institutional strengthening initiatives-through technical assistance. 5) The Project will support PGN's restructuring and institutional strengthening initiatives, through technical assistance. |
Original sector | FY17 - Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Oil and Gas, Natural Gas, Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Indonesia
- Sarulla Geothermal Power Plant
- Cirebon CoalFired Power Plant Expansion West Java
- Rantau Dedap Geothermal Power Project South Sumatra
- Muara Karang Expansion Project Jakarta Indonesia
- Cirata Floating Photovoltaic Power Plant
- Tanjung Jati B Power Plant Expansion
- Tolo Wind Park
- Jatiluhur I Drinking Water Supply System
