JBM Auto Limited (“JBM Auto”) as the Original Equipment Manufacturer (OEM) partner and JBM Ecolife Mobility Private Limited (“JBM Ecolife Mobility” or “JBM Ecolife”) is identified as the selected bidder (in March 2024) for the procurement, operation and maintenance (O&M) of electric buses (e-bus) and charging infrastructures across multiple cities in the State of Maharashtra, India and one city in

Status
Prospective
Sector
Electric Vehicles (EVs), Road, Power Generation (CCGT), Automotive, Mass Transit, Car parking, Government
Location
India
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about JBM Ecolife 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “JBM Ecolife 1” is an infrastructure initiative in the Electric Vehicles (EVs) sector, located in India. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

pending

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

JBM Auto Limited (“JBM Auto”) as the Original Equipment Manufacturer (OEM) partner and JBM Ecolife Mobility Private Limited (“JBM Ecolife Mobility” or “JBM Ecolife”) is identified as the selected bidder (in March 2024) for the procurement, operation and maintenance (O&M) of electric buses (e-bus) and charging infrastructures across multiple cities in the State of Maharashtra, India and one city in the State of Assam, India. IFC is considering debt investment of upto US$250 million to JBM Auto and/or in entities majority owned by it, specifically: (i) JBM Ecolife Mobility Private Limited; (ii) Ecolife Mobility Vehicles Private Limited (EMVPL); (iii) Ecolife GT Mobility Private Limited; and (iv) Ecolife Mobility EV Private Limited (collectively referred to as the “Borrowers”) under a Strategic Client Framework (SCF). The investment will be subscribed to in multiple tranches, and the first tranche of US$70 million will be for Ecolife Mobility Vehicles Private Limited (“EMVPL” or the “Company”) to be utilized towards the procurement, operation, and maintenance of 1390 e-buses and development of related electric and civil infrastructure, for 24 depots across 21 cities, in the State of Maharashtra and Assam (the “Project”). Deployment of IFC investments under SCF will be to future projects that can be expected to meet the requirements of the IFC Performance Standards, within a reasonable period of time. Further, prior to a decision on the deployment of balance amount of the SCF to any future project, IFC will complete a review of that project and disclose the review findings. Accordingly, this ESRS and ESAP will be updated to reflect the findings of IFC’s review of future project(s).JBM Ecolife Mobility acts as a platform for e- bus concessions and has created a Special Purpose Vehicle (SPV), EMVPL for the purpose of the Project. EMVPL will enter into a separate Concession Agreement (CA) for each of the cities (with single or multiple depots) spelling out the terms of engagement between the respective State Transport Undertakings (STUs) / Public Transport Authorities (PTA)/ Municipal Transport Undertaking (or the “Authority”) and EMVPL. The Authority will provide depots to the EMVPL which will be either brownfield depot sites, wherein either the complete depot or part of the depot may be provided for e-bus operations; or, greenfield sites that will be developed by the Authority before handing it over to EMVPL as per the CA requirements. The Authority is responsible for providing land for the depot; electricity connection, power supply; bus permits; route schedule for the buses in advance; making annuity payment on time; bus conductors; and collecting the ticketing revenue. Following handover by Authority, EMVPL will have limited construction activity under its scope. EMVPL responsibility will primarily include installation of the charging stations and other infrastructure required for operating the depots and providing manpower including drivers to ensure continued bus service.Commensurate with the fleet size proposed for each depot, some of the key infrastructure at operational depots will include: (a) Charging shed with charging stations; (b) power distribution infrastructure; (c) Maintenance shed with multiple maintenance pits constructed by authority; (d) bus parking lot; (e) bus washing area; and (f) security control room.

Original sector

E-AD - Transit and Ground Passenger Transporation

Location

Country

India

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Electric Vehicles (EVs), Road, Power Generation (CCGT), Automotive, Mass Transit, Car parking, Government

Article published date

2026-10-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project