logo
ProjectClosed

JCB Studio / Jackson Clements Burrows Architects

The status, timeline and source of this project. A free account opens every field.

Source: ArchDaily

The interior is unadorned. Raw expression of new structure is exposed throughout the additions. Laminated timber beams, particle board, steelwork, and trusses remain off-the-shelf items and can be salvaged for future re-use. The imperfections and naked tectonic nature of the design are celebrated. Workstations are custom-designed as interlocking units to enable flat-pack relocation. The modular de

Status
Closed
Sector
Forest Products and Packaging, Raw Materials, Energy Storage, Manufacturing (Industrial), Road, Solar, Car parking, Warehouse, Residential, Power Generation (CCGT), Electric Vehicles (EVs), Automotive, Commercial
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about JCB Studio / Jackson Clements Burrows Architects

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “JCB Studio / Jackson Clements Burrows Architects” is an infrastructure initiative in the Forest Products and Packaging sector. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The interior is unadorned. Raw expression of new structure is exposed throughout the additions. Laminated timber beams, particle board, steelwork, and trusses remain off-the-shelf items and can be salvaged for future re-use. The imperfections and naked tectonic nature of the design are celebrated. Workstations are custom-designed as interlocking units to enable flat-pack relocation. The modular design enables a variety of configurations from parallel runs to clusters by assembling the ‘kit of parts’ allowing the studio to be re-planned for change.Text description provided by the architects.This adaptive reuse project in Swan StreetRichmondbecame the new home for our multidisciplinary design studio after we outgrew our previous location in Melbourne’s CBD. We began by evaluating the constraints of our previous studio while developing a strategy focused on a flexible work culture, new technologies, and an increased commitment to sustainability.Operational energy is reduced further by extensive bike parking with EOT facilities and the provision of a dedicated electric car for team use. Operable windows and large door openings allow for whole-of-building cross-flow ventilation to support ‘off-grid’ self-sustained energy use in suitable climate conditions. In late 2020, JCB proudly became Climate Active certified.Retaining the existing building was an important part of JCB’s long-term view of the site occupancy and sustainability strategy. The project features a Photovoltaic 60kW solar array, supporting three 13 kWH storage batteries. The office is fully electric and the power system supports operational power for the office, electric car charging and backup power provision.The contemporary additions were designed to be cost-effective and to complement the existing mid-century industrial architecture. The interior design was underpinned by a commitment to reuse and salvage, understanding the building will likely be demolished and redeveloped in the future.After investigating new build opportunities, we concluded an adaptive reuse approach that retained the original warehouse was the most suitable strategy. The primary space within the existing building structure is anchored by a large clear span floorplate covered by a sawtooth roof, providing south daylight access and ideal orientation for a solar farm. The central floor space provides efficiencies for workstation planning. The perimeter spaces beyond the central floor plate were adapted to accommodate meeting rooms, wet areas, and social spaces. The existing second floor was expanded on the building’s west side to include outdoor terrace space. An additional mezzanine floor with workspaces was added to the northern frontage, covering the carpark, bicycle parking, and storage spaces.An important social activator was the inclusion of a café (345). The café is owned and operated by JCB and provides a space for our team to socialize with visitors. The café activates the pedestrian laneway and provides a welcome coffee and lunch destination. Operating in unison with the studio, clients often visit the café on arrival and enter the studio with their team. Together with landscaping, lighting, and graphic art, the three elevations are refreshed to present a unique, active streetscape. The design improves pedestrian safety through active and passive surveillance systems and 24-hour lighting at the perimeter of the building.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Raw Materials, Energy Storage, Manufacturing (Industrial), Road, Solar, Car parking, Warehouse, Residential, Power Generation (CCGT), Electric Vehicles (EVs), Automotive, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project