JCB Studio / Jackson Clements Burrows Architects
The status, timeline and source of this project. A free account opens every field.
Source: ArchDaily
The interior is unadorned. Raw expression of new structure is exposed throughout the additions. Laminated timber beams, particle board, steelwork, and trusses remain off-the-shelf items and can be salvaged for future re-use. The imperfections and naked tectonic nature of the design are celebrated. Workstations are custom-designed as interlocking units to enable flat-pack relocation. The modular de
- Status
- Closed
- Sector
- Forest Products and Packaging, Raw Materials, Energy Storage, Manufacturing (Industrial), Road, Solar, Car parking, Warehouse, Residential, Power Generation (CCGT), Electric Vehicles (EVs), Automotive, Commercial
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about JCB Studio / Jackson Clements Burrows Architects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The interior is unadorned. Raw expression of new structure is exposed throughout the additions. Laminated timber beams, particle board, steelwork, and trusses remain off-the-shelf items and can be salvaged for future re-use. The imperfections and naked tectonic nature of the design are celebrated. Workstations are custom-designed as interlocking units to enable flat-pack relocation. The modular design enables a variety of configurations from parallel runs to clusters by assembling the ‘kit of parts’ allowing the studio to be re-planned for change.Text description provided by the architects.This adaptive reuse project in Swan StreetRichmondbecame the new home for our multidisciplinary design studio after we outgrew our previous location in Melbourne’s CBD. We began by evaluating the constraints of our previous studio while developing a strategy focused on a flexible work culture, new technologies, and an increased commitment to sustainability.Operational energy is reduced further by extensive bike parking with EOT facilities and the provision of a dedicated electric car for team use. Operable windows and large door openings allow for whole-of-building cross-flow ventilation to support ‘off-grid’ self-sustained energy use in suitable climate conditions. In late 2020, JCB proudly became Climate Active certified.Retaining the existing building was an important part of JCB’s long-term view of the site occupancy and sustainability strategy. The project features a Photovoltaic 60kW solar array, supporting three 13 kWH storage batteries. The office is fully electric and the power system supports operational power for the office, electric car charging and backup power provision.The contemporary additions were designed to be cost-effective and to complement the existing mid-century industrial architecture. The interior design was underpinned by a commitment to reuse and salvage, understanding the building will likely be demolished and redeveloped in the future.After investigating new build opportunities, we concluded an adaptive reuse approach that retained the original warehouse was the most suitable strategy. The primary space within the existing building structure is anchored by a large clear span floorplate covered by a sawtooth roof, providing south daylight access and ideal orientation for a solar farm. The central floor space provides efficiencies for workstation planning. The perimeter spaces beyond the central floor plate were adapted to accommodate meeting rooms, wet areas, and social spaces. The existing second floor was expanded on the building’s west side to include outdoor terrace space. An additional mezzanine floor with workspaces was added to the northern frontage, covering the carpark, bicycle parking, and storage spaces.An important social activator was the inclusion of a café (345). The café is owned and operated by JCB and provides a space for our team to socialize with visitors. The café activates the pedestrian laneway and provides a welcome coffee and lunch destination. Operating in unison with the studio, clients often visit the café on arrival and enter the studio with their team. Together with landscaping, lighting, and graphic art, the three elevations are refreshed to present a unique, active streetscape. The design improves pedestrian safety through active and passive surveillance systems and 24-hour lighting at the perimeter of the building. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Raw Materials, Energy Storage, Manufacturing (Industrial), Road, Solar, Car parking, Warehouse, Residential, Power Generation (CCGT), Electric Vehicles (EVs), Automotive, Commercial |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects
- Ilim Group Ust Ilimsk Paper Factory
- Evanston Centre
- ASUW Shell House Restoration
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- CS 560/PINE STREET IN LUMBER CITY - TIA
- RENWICK STREET FROM W RAILROAD STREET TO JONES STREET - TIA
- Paper Work
- Loop 9 - Segment A: US 67 to IH 35E - Dallas/Ellis Counties
