JDR wins Leucate Floating Offshore wind project in France
Sector: Manufacturing (Industrial) • Location: France
Source: Energy Projects & Technology
JDR has been awarded a contract to supply, test and terminate the 66kV dynamic cables in consortium with SDI, part of the DEME Group for the Leucate floating wind farm. The consortium was awarded the contract by Réseau de Transport d’Électricité (RTE) and Eoliennes Flottantes du Golfe du Lion’s (EFGL), a consortium comprising Engie, EDP Renewables, and Caisse des Dépôts. Once completed, Leucate wi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | JDR has been awarded a contract to supply, test and terminate the 66kV dynamic cables in consortium with SDI, part of the DEME Group for the Leucate floating wind farm. The consortium was awarded the contract by Réseau de Transport d’Électricité (RTE) and Eoliennes Flottantes du Golfe du Lion’s (EFGL), a consortium comprising Engie, EDP Renewables, and Caisse des Dépôts. Once completed, Leucate will be one of the largest offshore floating wind farms in France. Located off the coast of the Leucate-Le Barcarès area, the demonstration floating wind farm will feature three V164-10.0 MW wind turbines, in water depths of 65 to 80 metres. JDR will design and manufacture the dynamic and static cables to connect the floating turbines to the shore, where they will connect to a grid at Saint-Laurent de la Salanque. SDI will undertake the overall delivery and installation of the cables provided by JDR. JDR’s ‘wet design’ 66kV cable removes the need for a lead radial water barrier – the component most susceptible to dynamic fatigue due to the movement of a floating turbine. In addition, the specially designed breakaway system will then protect the floating platform in the unlikely event of a mooring line failure in harsh weather conditions. Wojtek Skoczylas, CSO at JDR Cables, commented: “The floating offshore wind market is accelerating at a rapid pace. As waters get deeper, innovations in 66kV dynamic cables like ours will be required to meet demand. It’s an exciting time for the industry and subsea cable technology! We’re delighted to have won this project and to be again working in close partnership with the DEME group, having collaborated on many previous projects.” The cables will be manufactured at JDR’s state-of-the-art facility in Hartlepool, UK in 2022 before being shipped to France for installation in 2022. The contract comes as part of France’s target to have up to 12.4 GW of fixed-bottom and floating offshore wind capacity either in operation or under development by the end of 2028. Source: https://www.jdrcables.com/Image source: Courtesy of JDR Cables Read more Subsea cable news here |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
