logo

JDR wins Leucate Floating Offshore wind project in France

Sector: Manufacturing (Industrial) • Location: France

Source: Energy Projects & Technology

Project

JDR has been awarded a contract to supply, test and terminate the 66kV dynamic cables in consortium with SDI, part of the DEME Group for the Leucate floating wind farm. The consortium was awarded the contract by Réseau de Transport d’Électricité (RTE) and Eoliennes Flottantes du Golfe du Lion’s (EFGL), a consortium comprising Engie, EDP Renewables, and Caisse des Dépôts. Once completed, Leucate wi

Project Information FAQ

Project Information

3 Q
The project “JDR wins Leucate Floating Offshore wind project in France” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in France. Taiyo aggregates data on it from Energy Projects & Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

JDR has been awarded a contract to supply, test and terminate the 66kV dynamic cables in consortium with SDI, part of the DEME Group for the Leucate floating wind farm. The consortium was awarded the contract by Réseau de Transport d’Électricité (RTE) and Eoliennes Flottantes du Golfe du Lion’s (EFGL), a consortium comprising Engie, EDP Renewables, and Caisse des Dépôts. Once completed, Leucate will be one of the largest offshore floating wind farms in France. Located off the coast of the Leucate-Le Barcarès area, the demonstration floating wind farm will feature three V164-10.0 MW wind turbines, in water depths of 65 to 80 metres. JDR will design and manufacture the dynamic and static cables to connect the floating turbines to the shore, where they will connect to a grid at Saint-Laurent de la Salanque. SDI will undertake the overall delivery and installation of the cables provided by JDR. JDR’s ‘wet design’ 66kV cable removes the need for a lead radial water barrier – the component most susceptible to dynamic fatigue due to the movement of a floating turbine. In addition, the specially designed breakaway system will then protect the floating platform in the unlikely event of a mooring line failure in harsh weather conditions. Wojtek Skoczylas, CSO at JDR Cables, commented: “The floating offshore wind market is accelerating at a rapid pace. As waters get deeper, innovations in 66kV dynamic cables like ours will be required to meet demand. It’s an exciting time for the industry and subsea cable technology! We’re delighted to have won this project and to be again working in close partnership with the DEME group, having collaborated on many previous projects.” The cables will be manufactured at JDR’s state-of-the-art facility in Hartlepool, UK in 2022 before being shipped to France for installation in 2022. The contract comes as part of France’s target to have up to 12.4 GW of fixed-bottom and floating offshore wind capacity either in operation or under development by the end of 2028. Source: https://www.jdrcables.com/Image source: Courtesy of JDR Cables Read more Subsea cable news here

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data