Jeanne d'Arc Boulevard Speed Harmonization Project
The owner, status and timeline of this project. A free account opens every field.
Source: Ottawa Citizen
A project to harmonize speed limits along the 7.5-kilometre stretch of Jeanne d'Arc Boulevard North between St. Joseph Boulevard and Inlet Private. The project aims to reduce the number of speed transitions from six to two, eliminate time-based exceptions, and implement an uninterrupted 40 km/h speed limit across all school zones, with 50 km/h limits on either side to improve safety and consistenc
- Status
- Prospective
- Sector
- Road, Government
- Location
- Ottawa, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Ottawa Citizen
ConstructChat
Ask ConstructChat about Jeanne d'Arc Boulevard Speed Harmonization Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A project to harmonize speed limits along the 7.5-kilometre stretch of Jeanne d'Arc Boulevard North between St. Joseph Boulevard and Inlet Private. The project aims to reduce the number of speed transitions from six to two, eliminate time-based exceptions, and implement an uninterrupted 40 km/h speed limit across all school zones, with 50 km/h limits on either side to improve safety and consistency for road users. |
Original sector | Transportation |
Location
Country | Canada |
State | Ontario |
City | Ottawa |
Source
Source | Ottawa Citizen |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
