Jedwabno Battery Energy Storage System (BESS)
Sector: Power Transmission • Location: Jedwabno, Poland
Source: Energías Renovables, el periodismo de las energías limpias.
Construction of a utility-scale battery energy storage system (BESS) with a capacity of 150 MW/300 MWh at Jedwabno, Poland. The project supports Poland's transition away from coal and grid stabilization, with secured revenues through a 17-year capacity market contract and a long-term optimisation agreement with Axpo.
- Status
- Under Construction
- Sector
- Power Transmission, Energy Storage, Power Generation (CCGT)
- Location
- Jedwabno, Poland
- Updated
- 22 Jul 2026
- Source
- Energías Renovables, el periodismo de las energías limpias.
ConstructChat
Ask ConstructChat about Jedwabno Battery Energy Storage System (BESS)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a utility-scale battery energy storage system (BESS) with a capacity of 150 MW/300 MWh at Jedwabno, Poland. The project supports Poland's transition away from coal and grid stabilization, with secured revenues through a 17-year capacity market contract and a long-term optimisation agreement with Axpo. |
Original sector | Energy |
Location
Country | Poland |
City | Jedwabno |
Source
Source | Energías Renovables, el periodismo de las energías limpias. |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Energy Storage, Power Generation (CCGT) |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
