Jefferson & Stiern Park Restroom Improvements REBID
Sector: Water Supply and Storage • Location: Bakersfield, California, United States of America
Source: Dodge
Stiern Park - The work to be performed consists, in general, of the construction and placing of a pre-engineered pre-manufactured flush toilet restroom building. The Contractor will perform demolition of the existing picnic area, construct sewer, water and electrical service extensions and tie the same to the new building, provide grading, foundation preparation, structure backfill, grading, utili
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Car parking, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Automotive
- Location
- Bakersfield, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Jefferson & Stiern Park Restroom Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Stiern Park - The work to be performed consists, in general, of the construction and placing of a pre-engineered pre-manufactured flush toilet restroom building. The Contractor will perform demolition of the existing picnic area, construct sewer, water and electrical service extensions and tie the same to the new building, provide grading, foundation preparation, structure backfill, grading, utility connections, sidewalk work at the new restroom and other specified park locations, and other i... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Bakersfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Car parking, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Automotive |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
