JEFFERSON CITY SCHOOL SYSTEM - SRTS
Sector: Car parking • Location: Jefferson, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed net project length is approximately onemile, the extents of which reside entirely within the City of Jefferson. The eastern & western termini were determined by the creation of access to existing subdivisions & the improvements needed to provide inter-school road crossings. The proposed improvements include construction of an urban section with 5’ sidewalk extending along the southe
- Status
- Closed
- Sector
- Car parking, Education, Road, Government, Automotive, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Jefferson, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about JEFFERSON CITY SCHOOL SYSTEM - SRTS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed net project length is approximately onemile, the extents of which reside entirely within the City of Jefferson. The eastern & western termini were determined by the creation of access to existing subdivisions & the improvements needed to provide inter-school road crossings. The proposed improvements include construction of an urban section with 5’ sidewalk extending along the southern side of Old Pendergrass Rd from Fountainhead Dr to Hoschton St. This proposed sidewalk connects the entrance driveway of the Jefferson Public Library to the entrance driveways of Jefferson Academy and Middle Schools, as well as the entrance to the Preserve and Fountainhead subdivisions. In addition to the aforementioned improvements, new storm drains, crosswalks, and curb & gutter are also integrated into the project. Lastly, ADA-compliant ramps will be installed at the side road intersections along Old Pendergrass Road and Hoschton Street within the project limits. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Jefferson |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Education, Road, Government, Automotive, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
