logo

JEFFERSONVILLE RD FM SR 19/EMERY HWY TO WALNUT CREEK BRIDGE

Sector: Bridge • Location: Macon, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

This project combined with project PI # 351095 consists of the widening and reconstruction of Jeffersonville Rd/CR 727 from Emery Hwy to Walnut Creek for a total of 0.70 miles. The existing facility is a rural two-lane (one 12-foot travel lane in each direction). The existing major structure is a narrow and structurally deficient 180 foot x 24 foot bridge over Walnut Creek with a sufficiency ratin

Project Information FAQ

Project Information

4 Q
The project “JEFFERSONVILLE RD FM SR 19/EMERY HWY TO WALNUT CREEK BRIDGE” is an infrastructure initiative in the Bridge sector, located in Macon, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project combined with project PI # 351095 consists of the widening and reconstruction of Jeffersonville Rd/CR 727 from Emery Hwy to Walnut Creek for a total of 0.70 miles. The existing facility is a rural two-lane (one 12-foot travel lane in each direction). The existing major structure is a narrow and structurally deficient 180 foot x 24 foot bridge over Walnut Creek with a sufficiency rating of 21.7. The proposed typical section will consist of four 12-foot travel lanes (two in each direction), a 14-foot flush median, curb and gutter, and sidewalks. The proposed project will improve the operational efficiency of the facility. This project is in conjunction with project PI # 342080, STP-3223(2) and combined with project PI # 351095, BRMLB-3223(6)._

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data