JEK2 Nuclear Power Plant Project
The owner, status and timeline of this project. A free account opens every field.
Source: Business Korea
KHNP has withdrawn from the feasibility study for the JEK2 project, which aims to construct a large-scale nuclear power plant near Slovenia's Krško nuclear facility.
- Status
- Closed
- Sector
- Nuclear, Power Generation (CCGT)
- Location
- Slovenia
- Updated
- 22 Jul 2026
- Source
- Business Korea
ConstructChat
Ask ConstructChat about JEK2 Nuclear Power Plant Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | KHNP has withdrawn from the feasibility study for the JEK2 project, which aims to construct a large-scale nuclear power plant near Slovenia's Krško nuclear facility. |
Original sector | Energy |
Location
Country | Slovenia |
Source
Source | Business Korea |
URL |
More Details
Record type | Project |
Sector | Nuclear, Power Generation (CCGT) |
Article published date | 2025-03-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Nuclear projects in Slovenia
- ZIROVSKI VRH
- Ensuring the safety of intervention units in the event of a nuclear or radiological accident
- JEK2 Nuclear Newbuild Project
- DNA Data storage
- FAçade bio-CArbon based anti UV coating to prevent DEterioration of wooden buildings
- COx-free Hydrogen Production in Additively Manufactured Electrified Reactor through Catalytic Decomposition of Ammonia
- Amorphous Speculative Compression
- New Nuclear Power Plant Construction in Slovenia
