Jemez Mountain Fire Protection Phase IV
Sector: Steel • Location: Los Alamos, New Mexico, United States of America
Source: Dodge
Furnish and installation of a new welded 500,000 gallon steel tank, appurtenant yard piping between the new 500,000 gallon tank, the existing Pajarito # 4 tank and the first (lowest) booster station (booster station to be constructed under separate contract) is included, along with site grading, rock excavation, and all other necessary site civil work. Also included is the necessary electrical pow
- Status
- Closed
- Sector
- Steel, Government, Consumer Products, Telecommunications, Broadband, Commercial, Power Transmission, Power Generation (CCGT), Raw Materials, Metal
- Location
- Los Alamos, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Jemez Mountain Fire Protection Phase IV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnish and installation of a new welded 500,000 gallon steel tank, appurtenant yard piping between the new 500,000 gallon tank, the existing Pajarito # 4 tank and the first (lowest) booster station (booster station to be constructed under separate contract) is included, along with site grading, rock excavation, and all other necessary site civil work. Also included is the necessary electrical power supply elements from the existing power lines, and connections to the fiber-optics line. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Los Alamos |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Government, Consumer Products, Telecommunications, Broadband, Commercial, Power Transmission, Power Generation (CCGT), Raw Materials, Metal |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
