logo

Jeneponto Coal-Fired Power Plant, Phase - II, South Sulawesi

One of 10,000+ projects Taiyo tracks in Indonesia.

Source: Reconnecting Asia

Project
Completed

Jeneponto Coal-Fired Power Plant, Phase - II, South Sulawesi

Status
Closed
Sector
Power Generation (CCGT), Geothermal, Manufacturing (Industrial)
Location
Indonesia
Updated
22 Jul 2026
Source
Reconnecting Asia

ConstructChat

Ask ConstructChat about Jeneponto Coal-Fired Power Plant, Phase - II, South Sulawesi

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Jeneponto Coal-Fired Power Plant, Phase - II, South Sulawesi” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Indonesia. Taiyo aggregates data on it from Reconnecting Asia.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Jeneponto Coal-Fired Power Plant, Phase - II, South Sulawesi

Original sector

Powerplant

Budget

Location

Country

Indonesia

Source

Source reliability

Medium

Source

Reconnecting Asia

More Details

Record type

Project

Sector

Power Generation (CCGT), Geothermal, Manufacturing (Industrial)

Article published date

2023-11-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project