Jensen Dam Flood Handling Upgrades
Sector: Hydro • Location: Magrath, Alberta, Canada
Source: Dodge USA
Construction of the following work: Operation Spillway Rehabilitation Southern Region. APPROXIMATE QUANTITIES: 3 200 Cubic metres Excavation; 4 250 Cubic metres Fill Placement; 8 000 tonnes Erosion Protection; 228 metres Drainage system; 8 600 Square metres Landscaping; Contractor to supply all materials. Contract Completion Date: May 31, 2021.
- Status
- Under Construction
- Sector
- Hydro, Commercial, Manufacturing (Industrial), Waste Processing and Treatment, Water Supply and Storage
- Location
- Magrath, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Jensen Dam Flood Handling Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of the following work: Operation Spillway Rehabilitation Southern Region. APPROXIMATE QUANTITIES: 3 200 Cubic metres Excavation; 4 250 Cubic metres Fill Placement; 8 000 tonnes Erosion Protection; 228 metres Drainage system; 8 600 Square metres Landscaping; Contractor to supply all materials. Contract Completion Date: May 31, 2021. |
Procurement method |
Location
Country | Canada |
State | Alberta |
City | Magrath |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Commercial, Manufacturing (Industrial), Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Manitoba Hydro High Voltage Test Facility
- Wuskwatim Generating Station
- Manitoba Hydro Dorsey Converter Station
- Beeton Hydroelectric Development
- Thorold Cogeneration Project Ontario Canada
- Claresholm Solar Project Alberta
- Halton Hills Combined Cycle Plant
- Highway Rehab -- Bridge replacement Power Dam Interchange 786, United Counties of Stormont, Dundas and Glengarry
