Jetstream #3 and #4 Well-Testing at Topaz Project
One of 10,000+ projects Taiyo tracks in Minnesota.
Source: The Globe and Mail
Down-hole wireline testing was conducted at Jetstream #3 and #4 wells at the Topaz Project by Pulsar Helium Inc. The tests included formation microresistivity imaging, dipole sonic, resistivity, gamma, and neutron density logs. The data collected is being sent for expert evaluation and interpretation to support detailed reservoir characterization ahead of planned flow testing and further appraisal
- Status
- Under Construction
- Sector
- Water Supply and Storage
- Location
- Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- The Globe and Mail
ConstructChat
Ask ConstructChat about Jetstream 3 and 4 Well-Testing at Topaz Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | testing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Down-hole wireline testing was conducted at Jetstream #3 and #4 wells at the Topaz Project by Pulsar Helium Inc. The tests included formation microresistivity imaging, dipole sonic, resistivity, gamma, and neutron density logs. The data collected is being sent for expert evaluation and interpretation to support detailed reservoir characterization ahead of planned flow testing and further appraisal work. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Minnesota |
Source
Source | The Globe and Mail |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2025-12-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in USA
- Replacement of Badger Turbo Meters
- Golf Maintenance Building - Water Heater
- Replaced a 2" domestic water line
- Chill Water Pump Issue
- Pilot Program to Increase Water Supply
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
- SR A1A/Collins Ave from 44 St to 4700 blk and Indian Creek from 41 St to 44 St and SR 112/W 41 St over the Indian Creek Waterway bridge
- Replace 3" domestic water meter located in mechanical room 088
