logo

Jhajjar KT Power Transmission

Sector: Commercial • Location: Haryana, India

Source: KPTL

Project
Completed

The Jhajjar KT Power Transmission Project was a groundbreaking initiative undertaken by Kalpataru Power Transmission Limited (KPTL) in collaboration with The Haryana Vidyut Prasaran Nigam Limited (HVPNL). The project aimed to strengthen the power transmission infrastructure in the region and facilitate the smooth transfer of electricity. Under the DBFOT VGF model, KPTL undertook the responsibility

Project Information FAQ

Project Information

5 Q
The project “Jhajjar KT Power Transmission” is an infrastructure initiative in the Commercial sector, located in Haryana, India. Taiyo aggregates data on it from KPTL.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Jhajjar KT Power Transmission Project was a groundbreaking initiative undertaken by Kalpataru Power Transmission Limited (KPTL) in collaboration with The Haryana Vidyut Prasaran Nigam Limited (HVPNL). The project aimed to strengthen the power transmission infrastructure in the region and facilitate the smooth transfer of electricity. Under the DBFOT VGF model, KPTL undertook the responsibility of designing, building, financing, operating, and maintaining the transmission system. The project included the construction of a 100 km Transmission Line and the establishment of two 400kV Substations. These infrastructural components played a crucial role in transmitting power from the generation sources to the distribution network. The Jhajjar KT Power Transmission Project was successfully commissioned in March 2012, marking a significant milestone in the power transmission sector. With a concession period of 25 years, the project operated under the ownership of KPTL, ensuring the efficient management of the transmission system. Moreover, there was a provision for a possible extension of the concession period by another 10 years, allowing for long-term sustainability.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data