logo

Jhajjar Power Limited

Sector: Automotive • Location: Haryana, India

Source: World Bank Group

Project
Active

In July 2008, the concession awarder Haryana Power Generation Corporation Limited (HPGL) signed a 25 year MoU with China Light & power Company Limited (CLP) for development of a 1320 MW coal-fired thermal power plant in the state of Haryana. The facility is a 2x660MW coal-based power plant at Jhajjar in Haryana. The plant will utilize a highly efficient supercritical design which consumes less coa

Status
Prospective
Sector
Automotive, Geothermal, Wind, Power Generation (CCGT), Power Transmission, Commercial, Government
Location
Haryana, India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Jhajjar Power Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Jhajjar Power Limited” is an infrastructure initiative in the Automotive sector, located in Haryana, India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In July 2008, the concession awarder Haryana Power Generation Corporation Limited (HPGL) signed a 25 year MoU with China Light & power Company Limited (CLP) for development of a 1320 MW coal-fired thermal power plant in the state of Haryana. The facility is a 2x660MW coal-based power plant at Jhajjar in Haryana. The plant will utilize a highly efficient supercritical design which consumes less coal to generate the same amount of electricity and other advanced emission control equipment. The plant is constructed in line with China Light & Power Co Ltd (CLP)'s commitment to environmental responsibility. CLP established Jhajjar Power Limited (JPL), a special purpose vehicle, to implement the project. In Mar 2008, CLP Group was the lowest-priced bidder for the project compared to other two bidders, Lanco and Torrent Power. The State of Haryana will off take 90% of power output at a price of Rs2.996 ($0.066) per kWh for 25 years and the remaining 10% will be supplied to Delhi.Shandong Electric Power Corp is the supplier of the BTG package. Dongfang Turbine is to supply the main plant equipment, like turbines, and generators. The project achieved its financial closure on 17 September 2009. The project was expected to cost approximately USD 1503.6 million (INR 72790 @48.41 INR/USD)with a debt equity ratio of 72:28. JPL financed this project through an equity contribution of USD 427.6 million (INR 20700 million @ 48.41 INR/USD) and a loan of USD 1076 million. The debt is split into a USD701.9 mn (INR 33984.9mn @48.41 INR/USD) 15-year term loan, a USD 261.9 mn (INR12680mn @48.41 INR/USD) 15-year L/C facility and a $112m 15-year ECB term loan. The project is being funded with a 15 year term loan by a group of banks led by IDBI. Construction is divided into two 660MW units and the commissioning of the first unit is expected in December 2011 and the second unit in April 2012. All data updated based on financial closure in Sep 2009 from Projectware Dealogic.

Original sector

Energy

Procurement method

Budget

Location

Country

India

State

Haryana

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Geothermal, Wind, Power Generation (CCGT), Power Transmission, Commercial, Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project