logo

Jharsuguda- Sason 3rd & 4th line [2 X35 km]

Sector: Government • Location: Sambalpur, Odisha, India

Source: India Investment Grid (IIG)

Project
Dpr/Feasibility Study

Information East Coast Railway [ECoR] - II has come up with Jharsuguda- Sason 3rd & 4th line [2 X35 km] with a ticket size of 1113.34 INR Crores. This project in Railway Track sub-sector involves The current status of the project is DPR/Feasibility Study and is being developed through the EPC route. Economic/Social Impact of the Project Current GMT of existing UP & DN line is 54.28 and 45.56 resp

Project Information FAQ

Project Information

5 Q
The project “Jharsuguda- Sason 3rd & 4th line [2 X35 km]” is an infrastructure initiative in the Government sector, located in Sambalpur, Odisha, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

dpr/feasibility study

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information East Coast Railway [ECoR] - II has come up with Jharsuguda- Sason 3rd & 4th line [2 X35 km] with a ticket size of 1113.34 INR Crores. This project in Railway Track sub-sector involves The current status of the project is DPR/Feasibility Study and is being developed through the EPC route. Economic/Social Impact of the Project Current GMT of existing UP & DN line is 54.28 and 45.56 respectively. This heavily congested section caters the need of important mineral and industrial hubs of both Angul and Sambalpur districts. In addition to this, this route is connected with both Jharsuguda-Vizayanagam and Sambalpur-Talcher lines and serves the purpose of transportation of different ores and finished products like, iron, aluminum, coal and Bauxite. The chartered capacity and utilization data as per the line capacity statement of East Coast Railway [2020-21]. The percentage utilization for the year 2023-24 and 2024-25 is 142 & 150 respectively that is likely to increase further up to 166 by 2027-28. These figures indicate that the section is saturated. Hence 3rd and 4th line for the section is being proposed to match the requirements of the industries of this belt.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data