logo
ProjectPlanning Schematics

JHS 078 Roy H. Mann (Alteration)

Planning schematics · New York · Last reported Oct 2024

Source: Dodge USA

K078-Replace/discard existing door (Rm147/143); Replace Metal Partition Walls/Replace Non ADA Doors/Metal Studs/w ADA Wood Doors and Frames; Remove Built-In; Patch/Prime/Paint; Install wood doors with vision panel/Install new ACT Ceiling -SEE COMMENTS

Status
Prospective
Sector
Education, Metal, Government, Commercial
Location
Bergen Beach, New York, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about JHS 078 Roy H. Mann (Alteration)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “JHS 078 Roy H. Mann (Alteration)” is an infrastructure initiative in the Education sector, located in Bergen Beach, New York, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

K078-Replace/discard existing door (Rm147/143); Replace Metal Partition Walls/Replace Non ADA Doors/Metal Studs/w ADA Wood Doors and Frames; Remove Built-In; Patch/Prime/Paint; Install wood doors with vision panel/Install new ACT Ceiling -SEE COMMENTS

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Bergen Beach

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Education, Metal, Government, Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project