Jianghua Dongtian Wind Farm Project
Sector: Wind • Location: China
Source: World Bank Group
The Dongtian Wind Farm was a project invested by China WindPower Group, a Hong Kong based company, in Jianghua County, Hunan Province. The total investment was RMB 450 million (US$ 73.43 million) and China WindPower had a 100% stake in the project. Construction commenced in May 2015, and substantial construction had been finished by September 2015. The total electricity generation capacity was 48M
- Status
- Prospective
- Sector
- Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Jianghua Dongtian Wind Farm Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Dongtian Wind Farm was a project invested by China WindPower Group, a Hong Kong based company, in Jianghua County, Hunan Province. The total investment was RMB 450 million (US$ 73.43 million) and China WindPower had a 100% stake in the project. Construction commenced in May 2015, and substantial construction had been finished by September 2015. The total electricity generation capacity was 48MW. When operational, the annual revenue would reach RMB 50 million (US$ 8.16 million). |
Original sector | Energy |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
