logo

Jiangsu Huaiyin Urban-Rural Integration Project

Sector: Biomass • Location: China

Source: InfraPPPWorld

Project
Project Signed

The project involves the development of the two following facilities:- Huaiyin Waste-to-energy project, which has a designed daily household waste processing capacity of 1,000 tonnes and will be constructed in two phases. Phase I has a daily household waste processing capacity of 500 tonnes with a total investment of RMB250 million (US$38.6 million). The project will be constructed on a BOO (Build

Project Information FAQ

Project Information

4 Q
The project “Jiangsu Huaiyin Urban-Rural Integration Project” is an infrastructure initiative in the Biomass sector, located in China. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project signed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the development of the two following facilities:- Huaiyin Waste-to-energy project, which has a designed daily household waste processing capacity of 1,000 tonnes and will be constructed in two phases. Phase I has a daily household waste processing capacity of 500 tonnes with a total investment of RMB250 million (US$38.6 million). The project will be constructed on a BOO (Build-Operate-Own) basis with a concession period of 30 years. The project is expected to generate approximately 57,000,000 kWh of green electricity annually. - Huaiyin Biomass Power Generation project, which will be constructed in two phases as well. The total investment of Phase I is approximately RMB240 million (US$37 million), with a designed annual agricultural waste and straw processing capacity of 150,000 tonnes and will be equipped with a 75t/h furnace and an 18 MW power generator to generate 107,500,000 kWh of green electricity annually by mainly using agricultural waste and straw in Huaiyin and adjacent areas for power generation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data